SRO RTDP Sep. 1, 2023
Jump to navigation
Jump to search
Attendees: David L., Patrick A., Sergey B., Mariangela B., Vardan G., Marco B., Markus D.
Minutes
- Hall-B currently has 3 relevant items awaiting delivery
- Computer (expected Sept. 5)
- 2x U280 FPGA cards (delayed at least 3 months from computer order)
- Network Switch (expected in October)
- The switch is intended to host fibers from all VTPs. The switch will reside in the CH.
- Fibers are not yet installed to connect all VTPs. Only about a dozen are available.
- Sergey just received word from Chris C. the day before that the installation will not happen until next summer. No further details available yet.
- VTP Modules:
- The forward carriage has 18 VTPs with 6 more ordered.
- Each VTP has 2x10Gbps links
- Other Modules:
- Currently, only the FADC modules are capable of streaming.
- Some CAEN TDCs will be replaced by JLab TDCs next year.
- There are 3 other board types that are not ready for streaming. These need firmware that Ben Raydo is working on. He is overbooked and the timeline on those updates is not known.
- Hall-B storage includes a RAID disk capable of 2-3GB/s
- Patrick Noted that Run Group E will also use a LHD target in addition to the nuclear targets
- David will update the test plan.