Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 100: | Line 100: | ||
==SVT Instructions== | ==SVT Instructions== | ||
− | Before sending beam to Faraday cup, verify: | + | Before sending beam to Faraday cup, verify (and page expert if otherwise): |
* SVT should be open: "Position" at 0.000 mm in scaler GUI | * SVT should be open: "Position" at 0.000 mm in scaler GUI | ||
* SVT HV is off: all red/green indicators RED in SVT bias GUI | * SVT HV is off: all red/green indicators RED in SVT bias GUI |
Revision as of 18:43, 10 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Setpanyan
PDL: Harut AvagyanEvery Shift:
Every Run:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. |
Run Plan:March 10-11Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties.
|
|
|
|
|
|
|
|