== Run Plan:March 13-14 (morning) == | == Run Plan:March 13-14 (morning) == | ||
'''<font size=3> Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties. </font>''' | '''<font size=3> Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties. </font>''' | ||
Line 162: | Line 153: | ||
** after couple of minutes call MCC to see if they are ready to send the beam again, if so start the program again and ask for beam | ** after couple of minutes call MCC to see if they are ready to send the beam again, if so start the program again and ask for beam | ||
** repeat this for at least 10 trips and recovery | ** repeat this for at least 10 trips and recovery | ||
− | ** document each run in the logbook, start and end time and any details if necessary. Send HPS scaler GUI to logbook for every run | + | ** document each run in the logbook, start and end time and any details if necessary. Send HPS scaler GUI to logbook for every run |
+ | |||
+ | <!-- == Run Plan:March 10 - 11 == --> | ||
+ | '''<font size=3> Setup Beam to Hall-B Faraday cup Dump and Studies of Beam Properties. </font>''' | ||
+ | |||
+ | * Ask MCC to turn OFF the beam, turn OFF and degous tagger magnet | ||
+ | * After tagger magnet is degaussed, change beam configuration on "bta" GUI to "Electron" | ||
+ | * Insert Chromax screen on the downstream viewer on the beam | ||
+ | * Ask for ~10 nA beam, watch cctv6 to make sure spot on the downstream viewer is clear and approximatly at the center of the screen | ||
+ | * Check to make sure Faraday cup and nA BPMs read similar curents | ||
+ | * Use 2H02A harp do study beam profile and stability (beam current should not exceed 20 nA) | ||
+ | <!-- --> | ||
<!-- * <b> At 6am ask MCC for tagger magnet OFF and degaused, and hall seeped and put to restricted access </b> --> | <!-- * <b> At 6am ask MCC for tagger magnet OFF and degaused, and hall seeped and put to restricted access </b> --> | ||
{| | {| |
Revision as of 00:12, 15 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan
PDL: Harut AvagyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. Every Run:
|
Run Plan:March 13-14 (morning)Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties.
Setup Beam to Hall-B Faraday cup Dump and Studies of Beam Properties.
|
|
|
|
|
|
|
|