Line 118: | Line 118: | ||
− | == Run Plan:March | + | == Run Plan:March 14-15 (morning) == |
'''<font size=3> Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties. </font>''' | '''<font size=3> Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties. </font>''' | ||
<!-- | <!-- | ||
Line 163: | Line 163: | ||
* Ask for ~10 nA beam, watch cctv6 to make sure spot on the downstream viewer is clear and approximatly at the center of the screen | * Ask for ~10 nA beam, watch cctv6 to make sure spot on the downstream viewer is clear and approximatly at the center of the screen | ||
* Check to make sure Faraday cup and nA BPMs read similar curents | * Check to make sure Faraday cup and nA BPMs read similar curents | ||
− | * Use 2H02A harp do study beam profile | + | * Check beam position stability on 2H01 nA BPM |
+ | * If everything looks normal, rates on downstream counters are <10Hz, and on HPS-L and HPS-R are <30Hz at 10nA, proceed | ||
+ | * Use 2H02A harp do study beam profile (beam current should not exceed 20 nA), beam size should be X ~250 um Y < 150 um | ||
+ | * using downstream viewer GUI insert YAG then OTR screen. If beam is not well visible on these viewers, use the expert GUI to find proper position for each to have clear picture of the beam spot | ||
+ | * Energize HPS chicane - ask MCC to turn beam OFF, ramp up magnets to desired currents according to procedures (use the table) | ||
+ | * After magnets are at required settings (will take ~40 min) ask MCC for 10 nA beam | ||
+ | * Observe beam spot on chromox viewer, beam spot should be at the same place as before magnets were turned ON | ||
+ | |||
<!-- --> | <!-- --> | ||
<!-- * <b> At 6am ask MCC for tagger magnet OFF and degaused, and hall seeped and put to restricted access </b> --> | <!-- * <b> At 6am ask MCC for tagger magnet OFF and degaused, and hall seeped and put to restricted access </b> --> |
Revision as of 00:29, 15 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan
PDL: Harut AvagyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. Every Run:
|
Run Plan:March 14-15 (morning)Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties.
Setup Beam to Hall-B Faraday cup Dump and Studies of Beam Properties.
|
|
|
|
|
|
|
|