Line 128: | Line 128: | ||
* Make sure orbit locks are on and operational | * Make sure orbit locks are on and operational | ||
* Continueosly check beam positions on 2C21 and 2C24 looking strip charts. Oscilations should not be more than +/-0.05mm | * Continueosly check beam positions on 2C21 and 2C24 looking strip charts. Oscilations should not be more than +/-0.05mm | ||
− | <* Continue with tagger (2C24) harp scans at 20 nA to check beam position and width stability for ~ 1h - scans every 15 min with two settings of the harp | + | <!-- * Continue with tagger (2C24) harp scans at 20 nA to check beam position and width stability for ~ 1h - scans every 15 min with two settings of the harp |
** "Speed during scan" = 0.5 and "Time between scaler reads" = 0.1 | ** "Speed during scan" = 0.5 and "Time between scaler reads" = 0.1 | ||
** "Speed during scan" = 0.1 and "Time between scaler reads" = 0.1 | ** "Speed during scan" = 0.1 and "Time between scaler reads" = 0.1 | ||
Line 155: | Line 155: | ||
** document each run in the logbook, start and end time and any details if necessary. Send HPS scaler GUI to logbook for every run | ** document each run in the logbook, start and end time and any details if necessary. Send HPS scaler GUI to logbook for every run | ||
− | + | == Run Plan:March 10 - 11 == --> | |
'''<font size=3> Setup Beam to Hall-B Faraday cup Dump and Studies of Beam Properties. </font>''' | '''<font size=3> Setup Beam to Hall-B Faraday cup Dump and Studies of Beam Properties. </font>''' | ||
Revision as of 04:28, 15 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan
PDL: Harut AvagyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. Every Run:
|
Run Plan:March 14-15 (morning)Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties.
== Run Plan:March 10 - 11 == --> Setup Beam to Hall-B Faraday cup Dump and Studies of Beam Properties.
|
|
|
|
|
|
|
|