== Run Plan:March 14-15 (morning) == | == Run Plan:March 14-15 (morning) == | ||
'''<font size=3> Setup Beam to Hall-B Tagger Dump and Studies of Beam position stability. </font>''' | '''<font size=3> Setup Beam to Hall-B Tagger Dump and Studies of Beam position stability. </font>''' | ||
− | <!-- | + | <!-- |
* Ask MCC to turn ON tagger magnet | * Ask MCC to turn ON tagger magnet | ||
* Aid MCC to establish physics quality CW 1 pass beam to the Hall-B tagger dump: | * Aid MCC to establish physics quality CW 1 pass beam to the Hall-B tagger dump: | ||
Line 128: | Line 128: | ||
* Make sure orbit locks are on and operational | * Make sure orbit locks are on and operational | ||
* Continueosly check beam positions on 2C21 and 2C24 looking strip charts. Oscilations should not be more than +/-0.05mm | * Continueosly check beam positions on 2C21 and 2C24 looking strip charts. Oscilations should not be more than +/-0.05mm | ||
− | + | * Continue with tagger (2C24) harp scans at 20 nA to check beam position and width stability for ~ 1h - scans every 15 min with two settings of the harp | |
** "Speed during scan" = 0.5 and "Time between scaler reads" = 0.1 | ** "Speed during scan" = 0.5 and "Time between scaler reads" = 0.1 | ||
** "Speed during scan" = 0.1 and "Time between scaler reads" = 0.1 | ** "Speed during scan" = 0.1 and "Time between scaler reads" = 0.1 | ||
Line 144: | Line 144: | ||
For harps analysis use upstream left | For harps analysis use upstream left | ||
</font> --> | </font> --> | ||
− | + | * After MCC finishes beam tune for Hall-A | |
+ | ** make sure beam conditions did not changed, beam position and halo counter rates are as before | ||
+ | ** perform harp scans to verify that beam profile did not changed (2C21 and tagger/2C24 harps) | ||
+ | * When Rafayel is on shift, after 4pm, perform beam vertical motion during beam trips and recovery - | ||
** turn off the beam | ** turn off the beam | ||
− | ** move tagger harp (2C24) motor to ~ | + | ** move tagger harp (2C24) motor to ~101 in absolute position using the expert GUI |
** ask MCC to deliver 100 nA beam, make sure rates on Struck from upstream halo counters are on order of few MHz (if needed make slight movements with motor to get desire rates). Rates can be seen not only on Struck scaler but also on Jorger scaler using fwd_scaler.ald) | ** ask MCC to deliver 100 nA beam, make sure rates on Struck from upstream halo counters are on order of few MHz (if needed make slight movements with motor to get desire rates). Rates can be seen not only on Struck scaler but also on Jorger scaler using fwd_scaler.ald) | ||
** tell MCC that you will study beam motion during trip and recovery, so they should not bring beam back after the trip without your call | ** tell MCC that you will study beam motion during trip and recovery, so they should not bring beam back after the trip without your call |
Revision as of 11:33, 15 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan
PDL: Harut AvagyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. Every Run:
|
Run Plan:March 14-15 (morning)Setup Beam to Hall-B Tagger Dump and Studies of Beam position stability.
== Run Plan:March 10 - 11 == --> Setup Beam to Hall-B Faraday cup Dump and Studies of Beam Properties.
|
|
|
|
|
|
|
|