Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 135: | Line 135: | ||
* Start with tune mode beam, make sure beam is centered on the downstream viewer before going to CW | * Start with tune mode beam, make sure beam is centered on the downstream viewer before going to CW | ||
<b> Beam should be centered using correctors on 2C21, 2C23, and 2C24 girder. All correcotrs on 2H00 and 2H02 must bet at 0 value!!! </b> | <b> Beam should be centered using correctors on 2C21, 2C23, and 2C24 girder. All correcotrs on 2H00 and 2H02 must bet at 0 value!!! </b> | ||
− | * Ask for ~10 nA beam, watch cctv6 to make sure spot on the downstream viewer is clear and approximatly at the center of the screen | + | * Ask for ~10 nA CW beam, watch cctv6 to make sure spot on the downstream viewer is clear and approximatly at the center of the screen |
* Check to make sure Faraday cup and nA BPMs read similar curents | * Check to make sure Faraday cup and nA BPMs read similar curents | ||
− | * Check beam position stability on 2H01 nA | + | * Check beam position stability on 2H01 nA and 2H02 stripline BPMs |
− | * If everything looks normal, rates on downstream counters are <10Hz, and on HPS-L and HPS-R are <30Hz at 10nA, proceed | + | * If everything looks normal, rates on downstream counters are <10Hz, and on HPS-L and HPS-R are <30Hz at 10nA, send main HPS scaler GUI to the logbook and proceed |
− | * Use 2H02A harp to study beam profile (beam current should not exceed 20 nA), beam size should be X ~250 um Y < | + | * Center beam on the ECal using symmetry of rates on the top and bottom modules |
− | + | * Use 2H02A harp to study beam profile (beam current should not exceed 20 nA), beam size should be X-width ~250 um Y-width < 50 um | |
− | * Energize HPS chicane - ask MCC to turn beam OFF, ramp up magnets to desired currents according to procedures (use the table) | + | * Energize HPS chicane - ask MCC to turn beam OFF, ramp up magnets to desired currents according to procedures (use the table). |
* After magnets are at required settings (will take ~40 min) ask MCC for 10 nA beam | * After magnets are at required settings (will take ~40 min) ask MCC for 10 nA beam | ||
− | * Observe beam spot on chromox viewer, beam spot should be at the same place as before magnets were turned ON. If spot is shifted, change Frascati magnets curent to correct the posiotion - if beam is left of the original point current must be lowered, if it is shifted right current must be increased. Do current change with small steps, ~Amp | + | * Observe beam spot on chromox viewer, beam spot should be at the same place as before magnets were turned ON. If spot is shifted, change Frascati magnets curent to correct the posiotion - if beam is left of the original point current must be lowered, if it is shifted right current must be increased. Do current change with small steps, ~1 Amp |
* After chicane is set, record halo counter rates, turn beam off and insert HPS target, 4um W | * After chicane is set, record halo counter rates, turn beam off and insert HPS target, 4um W | ||
* Using table provided change chicane settings to move beam left and right on the target with ~1mm step. First move righ, stop when rates on halo counters will increase by several times, then move left until rates will start to go up. Turn beam off every time currents are changed | * Using table provided change chicane settings to move beam left and right on the target with ~1mm step. First move righ, stop when rates on halo counters will increase by several times, then move left until rates will start to go up. Turn beam off every time currents are changed | ||
− | <font size=2> <b> At 6am ask MCC for tagger magnet OFF and degaused, and hall swiped and put to the restricted access </b> </font> | + | <--! <font size=2> <b> At 6am ask MCC for tagger magnet OFF and degaused, and hall swiped and put to the restricted access </b> </font> --> |
{| | {| | ||
| valign=top | | | valign=top | |
Revision as of 16:11, 17 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan
PDL: Harut AvagyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. Every Run:
|
Run Plan:March 18-19 (morning)Always Setup Beam to the Hall-B Tagger Dump after long down
Upstream halo counters must count <10Hz, downstream counters ~Hz
Setup Beam to the Hall-B Faraday cup Dump and Setup HPS.
Beam should be centered using correctors on 2C21, 2C23, and 2C24 girder. All correcotrs on 2H00 and 2H02 must bet at 0 value!!!
<--! At 6am ask MCC for tagger magnet OFF and degaused, and hall swiped and put to the restricted access -->
|
|
|
|
|
|
|
|