== Run Plan:March 18-19 (swing/owl/day) == | == Run Plan:March 18-19 (swing/owl/day) == | ||
− | Overview: Close up Hall B during swing, sweep, and go to beam permit. Beams are expected | + | Overview: Close up Hall B during swing, sweep, and go to beam permit. Beams are expected beginning of owl. |
Program then will be to (1) restore beams to tagger; (2)starting Mar 19 day, make upstream beams available to machine | Program then will be to (1) restore beams to tagger; (2)starting Mar 19 day, make upstream beams available to machine | ||
for BPM calibration;(3)take beams to Hall B dump; (4)make downstream beams available to machine for BPM calibration. | for BPM calibration;(3)take beams to Hall B dump; (4)make downstream beams available to machine for BPM calibration. | ||
Line 133: | Line 133: | ||
* After beam tune is done send HPS scaler GUI to the logbook with proper comment | * After beam tune is done send HPS scaler GUI to the logbook with proper comment | ||
− | '''<font size=3> Give Beams to Machine | + | '''<font size=3> Give Beams to Machine beginning of day shift for BPM calibration of upstream beamline.</font>''' |
'''<font size=3> Setup Beam to the Hall-B Faraday cup Dump and Setup HPS. </font>''' | '''<font size=3> Setup Beam to the Hall-B Faraday cup Dump and Setup HPS. </font>''' | ||
Line 148: | Line 148: | ||
'''<font size=3> Give beams to machine for BPM calibration of downstream beamline. </font>''' | '''<font size=3> Give beams to machine for BPM calibration of downstream beamline. </font>''' | ||
− | '''<font size=3 | + | '''<font size=3> Energize chicane.</font>''' |
* Energize HPS chicane - ask MCC to turn beam OFF, ramp up magnets to desired currents according to procedures (use the table). | * Energize HPS chicane - ask MCC to turn beam OFF, ramp up magnets to desired currents according to procedures (use the table). | ||
* After magnets are at required settings (will take ~40 min) ask MCC for 10 nA beam | * After magnets are at required settings (will take ~40 min) ask MCC for 10 nA beam |
Revision as of 16:04, 18 March 2015
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: John Jaros
PDL: Harut AvagyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. Every Run:
|
Run Plan:March 18-19 (swing/owl/day)Overview: Close up Hall B during swing, sweep, and go to beam permit. Beams are expected beginning of owl. Program then will be to (1) restore beams to tagger; (2)starting Mar 19 day, make upstream beams available to machine for BPM calibration;(3)take beams to Hall B dump; (4)make downstream beams available to machine for BPM calibration. Always Setup Beam to the Hall-B Tagger Dump after long down
Upstream halo counters must count <10Hz, downstream counters ~Hz
Give Beams to Machine beginning of day shift for BPM calibration of upstream beamline. Setup Beam to the Hall-B Faraday cup Dump and Setup HPS.
Beam should be centered using correctors on 2C21, 2C23, and 2C24 girder. Correctors at 2H02 have been disabled.
Give beams to machine for BPM calibration of downstream beamline. Energize chicane.
|
|
|
|
|
|
|
|