<font color=blue><b> | <font color=blue><b> | ||
# Follow run plan as outlined by RC | # Follow run plan as outlined by RC | ||
− | # | + | # Once BPMs are calibrated, ask MCC if orbit locks are on, they should be. |
# Keep shift summary up-to-date in HBLOG | # Keep shift summary up-to-date in HBLOG | ||
# Document any beam condition change and send scaler GUIs to HBLOG | # Document any beam condition change and send scaler GUIs to HBLOG | ||
Line 119: | Line 119: | ||
− | == Run Plan:March | + | == Run Plan:March 21-22, 2015 (day/swing/owl) == |
− | Overview: Machine | + | |
+ | Overview: Machine has delivered beam to Hall A. Machine instabilities prevent sending beam to Hall D. Machine will work on instabilities today, and deliver beam to Hall B, beginning with day shift. BPM calibrations are postponed to Monday--we aren't ready today, and people aren't available on Sunday. Once beams are reestablished, we'll go to backup subsystem commissioning program. Program: 1) restore beams to tagger; (2)take beams to Hall B dump and install SVT Collimator; (3) set up chicane and test beam location on target; (4)re-establish DAQ and data taking; (5) Subsystem commissioning studies: trigger commissioning studies, struck scaler studies at 2H02, SVT commissioning. | ||
'''<font size=3> Always Setup Beam to the Hall-B Tagger Dump after long down </font>''' | '''<font size=3> Always Setup Beam to the Hall-B Tagger Dump after long down </font>''' | ||
Line 143: | Line 144: | ||
* Record Ecal count rates top vs bottom. Beam centered vertically? | * Record Ecal count rates top vs bottom. Beam centered vertically? | ||
* Turn beam off. Insert SVT Protection Collimator 4mm slit to its nominal position. Ecal Backgrounds? Vertically scan the collimator, measuring the halo counter rates vs vertical position. Beam should be within ~1mm of center. | * Turn beam off. Insert SVT Protection Collimator 4mm slit to its nominal position. Ecal Backgrounds? Vertically scan the collimator, measuring the halo counter rates vs vertical position. Beam should be within ~1mm of center. | ||
− | |||
− | |||
− | |||
− | |||
'''<font size=3> Energize chicane.</font>''' | '''<font size=3> Energize chicane.</font>''' | ||
Line 162: | Line 159: | ||
* Center beam on target with appropriate chicane currents just determined. Record bpm and screen shot and Ecal scalers. | * Center beam on target with appropriate chicane currents just determined. Record bpm and screen shot and Ecal scalers. | ||
* Do vertical scan of beam. Measure Ecal rates top/bottom vs vertical beam position. Record bpm 2H02 y and Ecal rates. Move beam vertically on bpm using upstream correctors, by 0.5 mm steps. Don't exceed 2mm motion. | * Do vertical scan of beam. Measure Ecal rates top/bottom vs vertical beam position. Record bpm 2H02 y and Ecal rates. Move beam vertically on bpm using upstream correctors, by 0.5 mm steps. Don't exceed 2mm motion. | ||
+ | |||
+ | '''<font size=3> Subsystem Commissioning Studies. Begin Data Taking.</font>''' | ||
+ | |||
+ | * Make sure DAQ is OK for data taking | ||
+ | * Trigger commissioning data runs. See Commissioning document on run wiki. | ||
+ | * Beam trip studies with Struck Scalers. See commissioning document on run wiki. Call Rafayel | ||
+ | * When SVT is ready for data, begin integrated data taking. Call Omar. | ||
Revision as of 09:26, 21 March 2015
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: John Jaros
PDL: Harut AvagyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. Every Run:
|
Run Plan:March 21-22, 2015 (day/swing/owl)Overview: Machine has delivered beam to Hall A. Machine instabilities prevent sending beam to Hall D. Machine will work on instabilities today, and deliver beam to Hall B, beginning with day shift. BPM calibrations are postponed to Monday--we aren't ready today, and people aren't available on Sunday. Once beams are reestablished, we'll go to backup subsystem commissioning program. Program: 1) restore beams to tagger; (2)take beams to Hall B dump and install SVT Collimator; (3) set up chicane and test beam location on target; (4)re-establish DAQ and data taking; (5) Subsystem commissioning studies: trigger commissioning studies, struck scaler studies at 2H02, SVT commissioning. Always Setup Beam to the Hall-B Tagger Dump after long down
Upstream halo counters must count <10Hz, downstream counters ~Hz
Setup Beam to the Hall-B Faraday cup Dump and Setup HPS.
Move beam with upstream correctors only This will guarantee small angles through HPS and safety of SVT
Beam should be centered using correctors on 2C21, 2C23, and 2C24 girder
Energize chicane.
Be very careful when changing magnet currents when beams are on. Must enter new current ACCURATELY. Small steps only.
Subsystem Commissioning Studies. Begin Data Taking.
|
|
|
|
|
|
|
|