== Run Plan:March 22-23, 2015 (day/swing/owl) == | == Run Plan:March 22-23, 2015 (day/swing/owl) == | ||
− | Overview: Machine will be down noon until about 4PM for RF separator work and establishing Halls A and D. HPS shifts are on. Program: 1) Take SVT baseline data with DAQ when beams are off; (2) when beams are back, re-establish beams to tagger and Hall B dump;(3) | + | Overview: Machine will be down noon until about 4PM for RF separator work and then establishing beams for Halls A and D. HPS shifts are on. Program: 1) Take SVT baseline data with DAQ when beams are off; (2) when beams are back, re-establish beams to tagger and Hall B dump;(3) perform SVT wire scans and harp scans to confirm orbit and adjust as necessary;(4)re-establish DAQ and data taking; (5) scan target vertically and horizontally, halo rates vs target (5) Take data. Subsystem commissioning studies: more trigger commissioning studies, SVT commissioning. |
Line 140: | Line 140: | ||
* After tagger magnet is degaussed, change beam configuration on "bta" GUI to "Electron" | * After tagger magnet is degaussed, change beam configuration on "bta" GUI to "Electron" | ||
* Insert Chromax screen on the downstream viewer on the beam. | * Insert Chromax screen on the downstream viewer on the beam. | ||
− | * 4mm SVT Protection collimator in place | + | * 4mm SVT Protection collimator in place; leave chicane on |
* Restore 1 nA CW beam and make sure beam is at y~-5mm; x~5mm Record spot. | * Restore 1 nA CW beam and make sure beam is at y~-5mm; x~5mm Record spot. | ||
− | * Check position at 2H02 harp, check centering in Ecal. | + | * Check position at 2H02 harp, check centering in Ecal. Go to 10 nA |
− | + | * Repeat SVT wire scans and adjust trajectories as needed. | |
− | |||
− | |||
* record scaler and bpm settings and beam location on screen. | * record scaler and bpm settings and beam location on screen. | ||
− | * | + | * |
− | |||
− | |||
− | |||
<b>Be very careful when changing magnet currents when beams are on. Must enter new current ACCURATELY. Small steps only. </b> | <b>Be very careful when changing magnet currents when beams are on. Must enter new current ACCURATELY. Small steps only. </b> | ||
− | * | + | * Turn beam off and insert HPS target, 4um W |
* Do horizontal scan of beam on target. Using table provided, first change Frascati settings, then PS settings to move beam left and right on the target with ~1mm step. Small changes only. Return to nominal beam positon. | * Do horizontal scan of beam on target. Using table provided, first change Frascati settings, then PS settings to move beam left and right on the target with ~1mm step. Small changes only. Return to nominal beam positon. | ||
− | * Do vertical scan of target at fixed beam position. Measure halo counter/ecal rates vs target position | + | * Do vertical scan of target at fixed beam position. Measure halo counter/ecal rates vs target position. Record data and graph |
* Do scan of SVT collimator, measuring counter rates vs SVT collimator position with nominal beam position. | * Do scan of SVT collimator, measuring counter rates vs SVT collimator position with nominal beam position. | ||
Line 162: | Line 157: | ||
* Make sure DAQ is OK for data taking | * Make sure DAQ is OK for data taking | ||
− | * More Trigger commissioning data runs. See | + | * More Trigger commissioning data runs. See Valery's note on the run Wiki under commissioning trigger. |
* When SVT is ready for data, begin integrated data taking. Call Omar. | * When SVT is ready for data, begin integrated data taking. Call Omar. | ||
− | * Absent other requests, take data at 50 nA. | + | * Absent other requests, take data at 50 nA. |
+ | |||
+ | '''<font size=3> Turn beams over to MCC during day shift March 23 for bpm calibration </font>''' | ||
+ | |||
+ | |||
Revision as of 15:46, 22 March 2015
Important Phone NumbersShift ScheduleShift-Taker's Checklist (old)Hot CheckoutBeam Time Accounting |
Procedures |
Manuals |
JLab Logbooks
|
RC: John Jaros
PDL: Stepan StepanyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. Every Run:
|
Run Plan:March 22-23, 2015 (day/swing/owl)Overview: Machine will be down noon until about 4PM for RF separator work and then establishing beams for Halls A and D. HPS shifts are on. Program: 1) Take SVT baseline data with DAQ when beams are off; (2) when beams are back, re-establish beams to tagger and Hall B dump;(3) perform SVT wire scans and harp scans to confirm orbit and adjust as necessary;(4)re-establish DAQ and data taking; (5) scan target vertically and horizontally, halo rates vs target (5) Take data. Subsystem commissioning studies: more trigger commissioning studies, SVT commissioning.
When beam is back, work with MCC to restore beam to Tagger Dump
Restore Beam to the Hall-B Faraday cup Dump and Setup HPS.
Be very careful when changing magnet currents when beams are on. Must enter new current ACCURATELY. Small steps only.
Subsystem Commissioning Studies. Begin Data Taking.
Turn beams over to MCC during day shift March 23 for bpm calibration
|
|
|
|
|
|
|
|
|