Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 102: | Line 102: | ||
| valign=top | | | valign=top | | ||
− | == Run Plan:March 6 - | + | == Run Plan:March 6 - 8 == |
'''<font size=3> Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties. </font>''' | '''<font size=3> Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties. </font>''' | ||
Line 112: | Line 112: | ||
* Continue with 2C24 (tagger) harp scans at 10 nA to check beam tilt angle motion over time, as well as beam position and width stability - ~2 hours (till about 7pm) with scans every 1/2 hour | * Continue with 2C24 (tagger) harp scans at 10 nA to check beam tilt angle motion over time, as well as beam position and width stability - ~2 hours (till about 7pm) with scans every 1/2 hour | ||
* Study beam tails as a function of current - every 1 hours increase beam curent to 100 nA and perform tagger harp scan. <b> for harps analysis use tagger right and upstream left </b> | * Study beam tails as a function of current - every 1 hours increase beam curent to 100 nA and perform tagger harp scan. <b> for harps analysis use tagger right and upstream left </b> | ||
+ | |||
+ | == Run Plan:March 8 - 9 (6am) == | ||
+ | '''<font size=3> Setup Beam to Hall-B Faraday cup Dump and Studies of Beam Properties. </font>''' | ||
+ | |||
{| | {| |
Revision as of 20:10, 8 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Setpanyan
PDL: Harut AvagyanEvery Shift:
Every Run:
|
Run Plan:March 6 - 8Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties.
Run Plan:March 8 - 9 (6am)Setup Beam to Hall-B Faraday cup Dump and Studies of Beam Properties.
|
|
|
|
|
|
|
|