Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 101: | Line 101: | ||
| valign=top | | | valign=top | | ||
+ | |||
+ | == Run Plan:March 8 - 9 (6am) == | ||
+ | '''<font size=3> Setup Beam to Hall-B Faraday cup Dump and Studies of Beam Properties. </font>''' | ||
+ | |||
+ | * Ask MCC to turn OFF the beam, turn OFF and degous tagger magnet | ||
+ | * After tagger magnet is OFF, change beam configuration on "bta" GUI to "Electron" | ||
+ | * insert Chromax screen on the downstream viewer on the beam | ||
+ | * ask for ~10 nA beam, watch cctv6 to make sure spot on the downstream viewer is clear and approximatly at the center of the screen | ||
+ | * check to make sure Faraday cup and nA BPMs read similar curents | ||
+ | * use 2H02A harp do study beam profile and stability (beam current should not exceed 20 nA) | ||
== Run Plan:March 6 - 8 == | == Run Plan:March 6 - 8 == | ||
Line 112: | Line 122: | ||
* Continue with 2C24 (tagger) harp scans at 10 nA to check beam tilt angle motion over time, as well as beam position and width stability - ~2 hours (till about 7pm) with scans every 1/2 hour | * Continue with 2C24 (tagger) harp scans at 10 nA to check beam tilt angle motion over time, as well as beam position and width stability - ~2 hours (till about 7pm) with scans every 1/2 hour | ||
* Study beam tails as a function of current - every 1 hours increase beam curent to 100 nA and perform tagger harp scan. <b> for harps analysis use tagger right and upstream left </b> | * Study beam tails as a function of current - every 1 hours increase beam curent to 100 nA and perform tagger harp scan. <b> for harps analysis use tagger right and upstream left </b> | ||
− | |||
− | |||
− | |||
Revision as of 20:16, 8 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Setpanyan
PDL: Harut AvagyanEvery Shift:
Every Run:
|
Run Plan:March 8 - 9 (6am)Setup Beam to Hall-B Faraday cup Dump and Studies of Beam Properties.
Run Plan:March 6 - 8Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties.
|
|
|
|
|
|
|
|