− | == Run Plan:March 6 - | + | == Run Plan:March 6 - 9 (6am) == |
'''<font size=3> Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties. </font>''' | '''<font size=3> Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties. </font>''' | ||
Line 119: | Line 119: | ||
* If beam x/y sizes are ~<250 um, proceed with program below, otherwise ask MCC to retune | * If beam x/y sizes are ~<250 um, proceed with program below, otherwise ask MCC to retune | ||
− | * | + | * MCC delivers beam that is set for HPS |
− | |||
− | |||
+ | * Continue with 2C24 (tagger) harp scans at 20 nA to check beam tilt angle motion over time, as well as beam position and width stability - till about 6 am, with scans every 1/2 hour | ||
+ | * Study beam tails as a function of current - every 1 hours increase beam curent to 100 nA and perform tagger harp scan. <b> for harps analysis use upstream left </b> | ||
+ | * <b> Ask for hall seep and restricted access at 6am </b> | ||
{| | {| | ||
| valign=top | | | valign=top | |
Revision as of 21:17, 8 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Setpanyan
PDL: Harut AvagyanEvery Shift:
Every Run:
|
Run Plan:March 6 - 9 (6am)Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties.
|
|
|
|
|
|
|
|