Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 99: | Line 99: | ||
'''[http://opweb.acc.jlab.org/CSUEApps/bta03/pd_shiftplan_history.php MCC Daily Meetings]''' | '''[http://opweb.acc.jlab.org/CSUEApps/bta03/pd_shiftplan_history.php MCC Daily Meetings]''' | ||
+ | ==SVT Instructions== | ||
+ | Before sending beam to Faraday cup, verify: | ||
+ | * SVT should be open: "Position" at 0.000 mm in scaler GUI | ||
+ | * SVT HV is off: all red/green indicators RED in SVT bias GUI | ||
+ | |||
+ | The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. | ||
| valign=top | | | valign=top | |
Revision as of 18:33, 10 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Setpanyan
PDL: Harut AvagyanEvery Shift:
Every Run:
SVT InstructionsBefore sending beam to Faraday cup, verify:
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. |
Run Plan:March 10-11Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties.
|
|
|
|
|
|
|
|