Line 121: | Line 121: | ||
* Use 2H02A harp do study beam profile and stability (beam current should not exceed 20 nA) | * Use 2H02A harp do study beam profile and stability (beam current should not exceed 20 nA) | ||
--> | --> | ||
− | == Run Plan:March 10- | + | == Run Plan:March 10-12 (morning) == |
'''<font size=3> Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties. </font>''' | '''<font size=3> Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties. </font>''' | ||
Line 127: | Line 127: | ||
* Aid MCC to establish physics quality CW 1 pass beam to the Hall-B tagger dump: | * Aid MCC to establish physics quality CW 1 pass beam to the Hall-B tagger dump: | ||
* When reasonable beam spot is achieved on the tagger dump screen perform harp scans, 2C21 and tagger (2C24) harps. Note: harp scans must be performed with 10 nA beam current | * When reasonable beam spot is achieved on the tagger dump screen perform harp scans, 2C21 and tagger (2C24) harps. Note: harp scans must be performed with 10 nA beam current | ||
− | * | + | * MCC delivers beam that is optimized for HPS, beam profile should be small at 2C21 (X/Y widths ~50 um) and should be large at tagger (2C24) harp (widths on 45/Y/X ~300 um), see previous harp scans |
+ | * Make sure 2C21 and 2C24 nA BPMs read stable X/Y positions. Postions on both BPMs must be close to zero as much as possible (at least |X/Y|<1). | ||
+ | * Make sure orbit locks are on and operational | ||
+ | * Continue with tagger (2C24) harp scans at 10 nA to check beam position and width stability for ~ 1h - scans every 15 min | ||
+ | * Study beam tails as a function of current - perform tagger harp scans with different harp setting at 10nA, 20nA, 50nA, 100nA: | ||
+ | ** nominal setting | ||
+ | ** "Speed during scan" = 0.2 and "Time between scaler reads" = 0.7 | ||
+ | ** | ||
+ | <b> for harps analysis use upstream left | ||
− | + | Harp settings can be changed on the GUI by typing new values in the window </b> | |
− | |||
− | |||
− | |||
<!-- * <b> At 6am ask MCC for tagger magnet OFF and degaused, and hall seeped and put to restricted access </b> --> | <!-- * <b> At 6am ask MCC for tagger magnet OFF and degaused, and hall seeped and put to restricted access </b> --> |
Revision as of 22:02, 11 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan
PDL: Harut AvagyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. Every Run:
|
Run Plan:March 10-12 (morning)Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties.
for harps analysis use upstream left Harp settings can be changed on the GUI by typing new values in the window
|
|
|
|
|
|
|
|