Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 136: | Line 136: | ||
** "Speed during scan" = 0.5 and "Time between scaler reads" = 0.35 | ** "Speed during scan" = 0.5 and "Time between scaler reads" = 0.35 | ||
** "Speed during scan" = 0.25 and "Time between scaler reads" = 0.7 | ** "Speed during scan" = 0.25 and "Time between scaler reads" = 0.7 | ||
− | <font color | + | <font color| |yellow|> |
Harp settings can be changed on the GUI by typing new values in the window | Harp settings can be changed on the GUI by typing new values in the window | ||
Revision as of 22:12, 11 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan
PDL: Harut AvagyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. Every Run:
|
Run Plan:March 10-12 (morning)Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties.
Harp settings can be changed on the GUI by typing new values in the window For harps analysis use upstream left
|
|
|
|
|
|
|
|