Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 127: | Line 127: | ||
* Use 2H02A harp do study beam profile and stability (beam current should not exceed 20 nA) | * Use 2H02A harp do study beam profile and stability (beam current should not exceed 20 nA) | ||
--> | --> | ||
− | == Run Plan:March | + | == Run Plan:March 13-14 (morning) == |
'''<font size=3> Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties. </font>''' | '''<font size=3> Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties. </font>''' | ||
Revision as of 21:16, 13 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan
PDL: Harut AvagyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. Every Run:
|
Run Plan:March 13-14 (morning)Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties.
Harp settings can be changed on the GUI by typing new values in the window For harps analysis use upstream left
|
|
|
|
|
|
|
|