Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 143: | Line 143: | ||
For harps analysis use upstream left | For harps analysis use upstream left | ||
− | + | </font> --> | |
− | </font> | ||
<!-- * When Rafayel is on shift, after 4pm, perform beam vertical motion during beam trips and recovery - | <!-- * When Rafayel is on shift, after 4pm, perform beam vertical motion during beam trips and recovery - | ||
** turn off the beam | ** turn off the beam |
Revision as of 04:30, 15 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan
PDL: Harut AvagyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. Every Run:
|
Run Plan:March 14-15 (morning)Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties.
Setup Beam to Hall-B Faraday cup Dump and Studies of Beam Properties.
|
|
|
|
|
|
|
|