Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 119: | Line 119: | ||
== Run Plan:March 14-15 (morning) == | == Run Plan:March 14-15 (morning) == | ||
− | '''<font size=3> Setup Beam to Hall-B Tagger Dump and Studies of Beam | + | '''<font size=3> Setup Beam to Hall-B Tagger Dump and Studies of Beam position stability. </font>''' |
<!-- --> | <!-- --> | ||
* Ask MCC to turn ON tagger magnet | * Ask MCC to turn ON tagger magnet |
Revision as of 04:33, 15 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan
PDL: Harut AvagyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. Every Run:
|
Run Plan:March 14-15 (morning)Setup Beam to Hall-B Tagger Dump and Studies of Beam position stability.
Setup Beam to Hall-B Faraday cup Dump and Studies of Beam Properties.
|
|
|
|
|
|
|
|