Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 147: | Line 147: | ||
** make sure beam conditions did not changed, beam position and halo counter rates are as before | ** make sure beam conditions did not changed, beam position and halo counter rates are as before | ||
** perform harp scans to verify that beam profile did not changed (2C21 and tagger/2C24 harps) | ** perform harp scans to verify that beam profile did not changed (2C21 and tagger/2C24 harps) | ||
− | * When Rafayel is on shift, after 4pm, perform beam vertical motion during beam trips and recovery - | + | * When Rafayel is on shift, after 4pm, perform studies of beam vertical motion during beam trips and recovery, as it was done yesterday but now wire positioned below the beam - |
** turn off the beam | ** turn off the beam | ||
** move tagger harp (2C24) motor to ~101 in absolute position using the expert GUI | ** move tagger harp (2C24) motor to ~101 in absolute position using the expert GUI | ||
− | ** ask MCC to deliver 100 nA beam, make sure rates on Struck from upstream halo counters are on order of few MHz (if needed make slight movements with motor to get desire rates). Rates can be seen not only on Struck scaler but also on Jorger scaler using fwd_scaler. | + | ** ask MCC to deliver 100 nA beam, make sure rates on Struck from upstream halo counters are on order of few MHz (if needed make slight movements with motor to get desire rates). Rates can be seen not only on Struck scaler but also on Jorger scaler using fwd_scaler.adl) |
** tell MCC that you will study beam motion during trip and recovery, so they should not bring beam back after the trip without your call | ** tell MCC that you will study beam motion during trip and recovery, so they should not bring beam back after the trip without your call | ||
** start "waveform" program, and ask MCC to deliver beam, 100 nA. When beam trips stop the run | ** start "waveform" program, and ask MCC to deliver beam, 100 nA. When beam trips stop the run |
Revision as of 11:35, 15 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan
PDL: Harut AvagyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. Every Run:
|
Run Plan:March 14-15 (morning)Setup Beam to Hall-B Tagger Dump and Studies of Beam position stability.
== Run Plan:March 10 - 11 == --> Setup Beam to Hall-B Faraday cup Dump and Studies of Beam Properties.
|
|
|
|
|
|
|
|