== Run Plan:March 14-15 (morning) == | == Run Plan:March 14-15 (morning) == | ||
'''<font size=3> Setup Beam to Hall-B Tagger Dump and Studies of Beam position stability. </font>''' | '''<font size=3> Setup Beam to Hall-B Tagger Dump and Studies of Beam position stability. </font>''' | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
* After MCC finishes beam tune for Hall-A | * After MCC finishes beam tune for Hall-A | ||
** make sure beam conditions did not changed, beam position and halo counter rates are as before | ** make sure beam conditions did not changed, beam position and halo counter rates are as before | ||
Line 175: | Line 152: | ||
* Using table provided change chicane settings to move beam left and right on the target with ~1mm step. First move righ, stop when rates on halo counters will increase by several times, then move left until rates will start to go up. Turn beam off rvery time currents are changed | * Using table provided change chicane settings to move beam left and right on the target with ~1mm step. First move righ, stop when rates on halo counters will increase by several times, then move left until rates will start to go up. Turn beam off rvery time currents are changed | ||
− | |||
<!-- * <b> At 6am ask MCC for tagger magnet OFF and degaused, and hall seeped and put to restricted access </b> --> | <!-- * <b> At 6am ask MCC for tagger magnet OFF and degaused, and hall seeped and put to restricted access </b> --> | ||
{| | {| |
Revision as of 11:39, 15 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan
PDL: Harut AvagyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. Every Run:
|
Run Plan:March 14-15 (morning)Setup Beam to Hall-B Tagger Dump and Studies of Beam position stability.
Setup Beam to Hall-B Faraday cup Dump and Studies of Beam Properties.
|
|
|
|
|
|
|
|