Line 133: | Line 133: | ||
** repeat this for at least 10 trips and recovery | ** repeat this for at least 10 trips and recovery | ||
** document each run in the logbook, start and end time and any details if necessary. Send HPS scaler GUI to logbook for every run | ** document each run in the logbook, start and end time and any details if necessary. Send HPS scaler GUI to logbook for every run | ||
− | |||
− | |||
− | |||
* Ask MCC to turn OFF the beam, turn OFF and degous tagger magnet | * Ask MCC to turn OFF the beam, turn OFF and degous tagger magnet | ||
* After tagger magnet is degaussed, change beam configuration on "bta" GUI to "Electron" | * After tagger magnet is degaussed, change beam configuration on "bta" GUI to "Electron" |
Revision as of 11:40, 15 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan
PDL: Harut AvagyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. Every Run:
|
Run Plan:March 14-15 (morning)Setup Beam to Hall-B Tagger Dump and Studies of Beam position stability.
|
|
|
|
|
|
|
|