Line 124: | Line 124: | ||
** make sure beam conditions did not changed, beam position and halo counter rates are as before | ** make sure beam conditions did not changed, beam position and halo counter rates are as before | ||
** perform harp scans to verify that beam profile did not changed (2C21 and tagger/2C24 harps) | ** perform harp scans to verify that beam profile did not changed (2C21 and tagger/2C24 harps) | ||
+ | ** work with MCC moving bean position on 2C21 and 2C24 nA BPMs and direction of beam upstream of them to see if lower counts on upstream halo counters can be achieved (HPS-L and HPS-R) | ||
* When Rafayel is on shift, after 4pm, perform studies of beam vertical motion during beam trips and recovery, as it was done yesterday but now wire positioned below the beam - | * When Rafayel is on shift, after 4pm, perform studies of beam vertical motion during beam trips and recovery, as it was done yesterday but now wire positioned below the beam - | ||
** turn off the beam | ** turn off the beam |
Revision as of 11:44, 15 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan
PDL: Harut AvagyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. Every Run:
|
Run Plan:March 14-15 (morning)Setup Beam to Hall-B Tagger Dump and Studies of Beam position stability.
Setup Beam to the Hall-B Faraday cup Dump and Setup HPS.
|
|
|
|
|
|
|
|