Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 149: | Line 149: | ||
* Observe beam spot on chromox viewer, beam spot should be at the same place as before magnets were turned ON. If spot is shifted, change Frascati magnets curent to correct the posiotion - if beam is left of the original point current must be lowered, if it is shifted right current must be increased. Do current change with small steps, ~Amp | * Observe beam spot on chromox viewer, beam spot should be at the same place as before magnets were turned ON. If spot is shifted, change Frascati magnets curent to correct the posiotion - if beam is left of the original point current must be lowered, if it is shifted right current must be increased. Do current change with small steps, ~Amp | ||
* After chicane is set, record halo counter rates, turn beam off and insert HPS target, 4um W | * After chicane is set, record halo counter rates, turn beam off and insert HPS target, 4um W | ||
− | * Using table provided change chicane settings to move beam left and right on the target with ~1mm step. First move righ, stop when rates on halo counters will increase by several times, then move left until rates will start to go up. Turn beam off | + | * Using table provided change chicane settings to move beam left and right on the target with ~1mm step. First move righ, stop when rates on halo counters will increase by several times, then move left until rates will start to go up. Turn beam off every time currents are changed |
<font size=2> <b> At 6am ask MCC for tagger magnet OFF and degaused, and hall swiped and put to the restricted access </b> </font> | <font size=2> <b> At 6am ask MCC for tagger magnet OFF and degaused, and hall swiped and put to the restricted access </b> </font> |
Revision as of 21:59, 15 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan
PDL: Harut AvagyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. Every Run:
|
Run Plan:March 14-15 (morning)Setup Beam to Hall-B Tagger Dump and Studies of Beam position stability.
Setup Beam to the Hall-B Faraday cup Dump and Setup HPS.
At 6am ask MCC for tagger magnet OFF and degaused, and hall swiped and put to the restricted access
|
|
|
|
|
|
|
|