Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 77: | Line 77: | ||
| valign=top width=350 | | | valign=top width=350 | | ||
− | == RC: | + | == RC: John Jaros == |
*(757) 575-7540 | *(757) 575-7540 | ||
*9 575 7540 from Counting Room | *9 575 7540 from Counting Room | ||
Line 90: | Line 90: | ||
# Document any beam condition change and send scaler GUIs to HBLOG | # Document any beam condition change and send scaler GUIs to HBLOG | ||
# Send "scaler_hps" GUI to logbook at least twice per shift or any time run conditions change | # Send "scaler_hps" GUI to logbook at least twice per shift or any time run conditions change | ||
− | #Peform 2H02A harp scan ones per shift or when beam conditions changed based on beam monitors (BPMs, halo rates, beam-viewer) | + | # Peform 2H02A harp scan ones per shift or when beam conditions changed based on beam monitors (BPMs, halo rates, beam-viewer) |
# Fill out shift checklist in the logbook, HBLOG, using template at least ones per shift or when run conditions change | # Fill out shift checklist in the logbook, HBLOG, using template at least ones per shift or when run conditions change | ||
# Continuously check quality of data | # Continuously check quality of data | ||
Line 118: | Line 118: | ||
− | == Run Plan:March 18-19 ( | + | == Run Plan:March 18-19 (swing/owl/day) == |
+ | |||
+ | |||
'''<font size=3> Always Setup Beam to the Hall-B Tagger Dump after long down </font>''' | '''<font size=3> Always Setup Beam to the Hall-B Tagger Dump after long down </font>''' | ||
Revision as of 15:26, 18 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: John Jaros
PDL: Harut AvagyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. Every Run:
|
Run Plan:March 18-19 (swing/owl/day)Always Setup Beam to the Hall-B Tagger Dump after long down
Upstream halo counters must count <10Hz, downstream counters ~Hz
Setup Beam to the Hall-B Faraday cup Dump and Setup HPS.
Beam should be centered using correctors on 2C21, 2C23, and 2C24 girder. All correcotrs on 2H00 and 2H02 must bet at 0 value!!!
<--! At 6am ask MCC for tagger magnet OFF and degaused, and hall swiped and put to the restricted access -->
|
|
|
|
|
|
|
|
Webcams:
|
Slow Controls: |
Accelerator:
|
Offline: |