Difference between revisions of "The HPS Run Wiki"
Line 90: | Line 90: | ||
# Once BPMs are calibrated, ask MCC if orbit locks are on, they should be. | # Once BPMs are calibrated, ask MCC if orbit locks are on, they should be. | ||
# Keep shift summary up-to-date in HBLOG | # Keep shift summary up-to-date in HBLOG | ||
− | ## Update the run table on Google Docs: [ | + | ## Update the run table on Google Docs: [https://docs.google.com/sheets Google Docs] |
# Document any beam condition change and send scaler GUIs to HBLOG | # Document any beam condition change and send scaler GUIs to HBLOG | ||
# Send "scaler_hps" GUI to logbook at least twice per shift or any time run conditions change | # Send "scaler_hps" GUI to logbook at least twice per shift or any time run conditions change |
Revision as of 13:31, 22 March 2015
Important Phone NumbersShift ScheduleShift-Taker's Checklist (old)Hot CheckoutBeam Time Accounting |
Procedures |
Manuals |
JLab Logbooks
|
RC: John Jaros
PDL: Stepan StepanyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. Every Run:
|
Run Plan:March 22-23, 2015 (day/swing/owl)Overview: Machine will be down noon until about 4PM for RF separator work and establishing Halls A and D. HPS shifts are on. Program: 1) Take SVT baseline data with DAQ when beams are off; (2) when beams are back, re-establish beams to tagger and Hall B dump;(3) set up chicane and perform SVT wire scans and harp scans to confirm orbit;(4)re-establish DAQ and data taking; (5) scan target vertically and horizontally, halo rates vs target (5) Take data. Subsystem commissioning studies: more trigger commissioning studies, SVT commissioning.
When beam is back, work with MCC to restore beam to Tagger Dump
Restore Beam to the Hall-B Faraday cup Dump and Setup HPS.
Energize chicane.
Be very careful when changing magnet currents when beams are on. Must enter new current ACCURATELY. Small steps only.
Subsystem Commissioning Studies. Begin Data Taking.
|
|
|
|
|
|
|
|
|