The HPS Run Wiki
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan
PDL: Harut AvagyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. Every Run:
|
Run Plan:March 14-15 (morning)Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties.
<* Continue with tagger (2C24) harp scans at 20 nA to check beam position and width stability for ~ 1h - scans every 15 min with two settings of the harp
Beam width in any direction should not depend on the harp scan speed, any dependence will indicate beam position oscilation
Harp settings can be changed on the GUI by typing new values in the window For harps analysis use upstream left -->
Setup Beam to Hall-B Faraday cup Dump and Studies of Beam Properties.
|
|
|
|
|
|
|
|