The HPS Run Wiki
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: John Jaros
PDL: Harut AvagyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. Every Run:
|
Run Plan:March 18-19 (swing/owl/day)Overview: Close up Hall B during swing, sweep, and go to beam permit. Beams are expected during owl. Program then will be to (1) restore beams to tagger; (2)starting Mar 19 day, make upstream beams available to machine for BPM calibration;(3)take beams to Hall B dump; (4)make downstream beams available to machine for BPM calibration. Always Setup Beam to the Hall-B Tagger Dump after long down
Upstream halo counters must count <10Hz, downstream counters ~Hz
Give Beams to Machine in day shift for BPM calibration of upstream beamline. Setup Beam to the Hall-B Faraday cup Dump and Setup HPS.
Beam should be centered using correctors on 2C21, 2C23, and 2C24 girder. Correctors at 2H02 have been disabled.
Give beams to machine for BPM calibration of downstream beamline. <font size=3. Energize chicane.,
|
|
|
|
|
|
|
|
Webcams:
|
Slow Controls: |
Accelerator:
|
Offline: |