Difference between revisions of "Procedures"

From JLAB Tritium Target
Jump to navigation Jump to search
Line 2: Line 2:
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=99405&cid=1626  TGT-PROC-17-001:  Hall A and C Cryotarget Lifter Test and Certification]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=99405&cid=1626  TGT-PROC-17-001:  Hall A and C Cryotarget Lifter Test and Certification]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=100199 TGT-PROC-17-005:  HATT Tritium Exhaust System Configuration Verification]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=100199 TGT-PROC-17-005:  HATT Tritium Exhaust System Configuration Verification]
 +
* TGT-PROC-17-008: Hall A CANS setup and test procedure for tritium mode
 +
* TGT-PROC-17-009: HATT vacuum system exhaust verification checklist
 +
* TGT-PROC-17-011: FSD Test/Verification Checklist
  
 
==Cell Assembly==
 
==Cell Assembly==
Line 15: Line 18:
  
 
==Operations==
 
==Operations==
 +
* TGT-PROC-17-010:  HATT Operator Manual
 +
* TGT-PROC-17-012:  HATT commissioning - beam steering and checkout, ion FSD, raster FSD, and density study
  
 
==Hall A Technical Procedures==
 
==Hall A Technical Procedures==

Revision as of 11:07, 15 September 2017

Equipment Setup and Checklists

Cell Assembly

Hall Access Procedures

Installation/Removal

Operations

  • TGT-PROC-17-010: HATT Operator Manual
  • TGT-PROC-17-012: HATT commissioning - beam steering and checkout, ion FSD, raster FSD, and density study

Hall A Technical Procedures