* [https://misportal.jlab.org/jlabDocs/document.seam?id=100448 TGT-PROC-17-008: Hall A CANS setup and test procedure for tritium mode] | * [https://misportal.jlab.org/jlabDocs/document.seam?id=100448 TGT-PROC-17-008: Hall A CANS setup and test procedure for tritium mode] | ||
* [https://misportal.jlab.org/jlabDocs/document.seam?id=100408 TGT-PROC-17-009: HATT vacuum system exhaust verification checklist] | * [https://misportal.jlab.org/jlabDocs/document.seam?id=100408 TGT-PROC-17-009: HATT vacuum system exhaust verification checklist] | ||
− | * TGT-PROC-17-011: FSD Test/Verification Checklist | + | * [https://misportal.jlab.org/jlabDocs/document.seam?id=100643 TGT-PROC-17-011: FSD Test/Verification Checklist] |
==Cell Assembly== | ==Cell Assembly== |
Revision as of 23:53, 5 October 2017
Equipment Setup and Checklists
- TGT-PROC-17-001: Hall A and C Cryotarget Lifter Test and Certification
- TGT-PROC-17-005: HATT Tritium Exhaust System Configuration Verification
- TGT-PROC-17-008: Hall A CANS setup and test procedure for tritium mode
- TGT-PROC-17-009: HATT vacuum system exhaust verification checklist
- TGT-PROC-17-011: FSD Test/Verification Checklist
Cell Assembly
- TGT-PROC-17-004: HATT Tritium Cell Examination, Assembly, and Testing Procedure
- TGT-PROC-17-003: Cleaning Procedure for High Purity Fluid Service
Hall Access Procedures
Installation/Removal
- TGT-PROC-17-002: Hall A Tritium Target Cell Installation
- TGT-PROC-17-006: Hall A Tritium Target Cell Removal
Operations
- TGT-PROC-17-010: HATT Operator Manual
- TGT-PROC-17-012: HATT commissioning - beam steering and checkout, ion chamber FSD calibration
- TGT-PROC-17-013: Hall A tritium target density study