Difference between revisions of "Procedures"

From JLAB Tritium Target
Jump to navigation Jump to search
Line 1: Line 1:
 
==Equipment Setup and Checklists==
 
==Equipment Setup and Checklists==
 
* TGT-PROC-17-001:  Hall A and C Cryotarget Lifter Test and Certification  https://misportal.jlab.org/jlabDocs/document.seam?id=99405&cid=1626
 
* TGT-PROC-17-001:  Hall A and C Cryotarget Lifter Test and Certification  https://misportal.jlab.org/jlabDocs/document.seam?id=99405&cid=1626
* TGT-PROC-17-005:  HATT Tritium Exhaust System Configuration Verification
+
* TGT-PROC-17-005:  HATT Tritium Exhaust System Configuration Verification https://misportal.jlab.org/jlabDocs/document.seam?id=100199
  
 
==Cell Assembly==
 
==Cell Assembly==
Line 8: Line 8:
  
 
==Hall Access Procedures==
 
==Hall Access Procedures==
 
+
* TGT-PROC-17-007:  Hall A Truck Ramp Access for Tritium Mode  https://misportal.jlab.org/jlabDocs/document.seam?id=100198
  
 
==Installation/Removal==
 
==Installation/Removal==

Revision as of 10:42, 15 September 2017

Equipment Setup and Checklists

Cell Assembly

Hall Access Procedures

Installation/Removal

  • TGT-PROC-17-002: Hall A Tritium Target Cell Installation
  • TGT-PROC-17-006: Hall A Tritium Target Cell Removal

Operations