April 25th, 2022

From kl project
Jump to navigation Jump to search

Attended: Justin, Moskov, Hovanes, Jim, Sean, and Igor. Mikhail has a beam in Juelich now.


  • On April 8th, we had a Hovanes' CPS meeting for a development of the engineering design of the Tiger hall with CPS [1]. It has Vitaly's slides and was a long discussion with Pavel and radiation situation in the Tiger Hall. Pavel promised to do some estiamtions. Hovanes reported the extended magnetic field using OPERA which Vitaly will use in his CPS calculations.
  • On April 14th, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [2]. Tim said that one can accomplish the engineering design this summer of 2022, all looks promising. Hovanes is thinking about a diagnostics.
  • On April 22st, we had a Hovanes' meeting for a development of the engineering design of the Tiger hall with CPS [3]. It has Vitaly's slides.
  • Pavel provided a radiation condition for CPS following a RadCon regulations as 5 mrem/h on the surface of the CPS assembly in 1 hr after beam is off.
  • Moskov said that accelerator folks are going buy a new laser to get 128-ns for us. Test is in order. Student is still working and situation looks promising for us.
  • Our next Collab meeting is scedule on May 27th.