Difference between revisions of "KLF beamline meeting - June 28, 2024"
Jump to navigation
Jump to search
(→Agenda) |
(→Agenda) |
||
Line 4: | Line 4: | ||
*; [[media:reasons_for_photon_beam.pdf | Photon beam in the hall during KLF?]] (ig, Sean) | *; [[media:reasons_for_photon_beam.pdf | Photon beam in the hall during KLF?]] (ig, Sean) | ||
+ | *; [https://wiki.jlab.org/klproject/images/8/88/CalCal-24062024.pdf Timing & energy calibration requirements for the calorimeters] | ||
*; Tungsten blocker length (Vitaly,Tim) | *; Tungsten blocker length (Vitaly,Tim) |
Revision as of 08:48, 28 June 2024
Agenda
- Announcements
- Tungsten blocker length (Vitaly,Tim)
-
- Tungsten procurement options ET95 and ET90
- K_long flux z-distribution from FLUKA
- Approximate EM shower z-distribution ,
- CPS & KPT design progress (Tim)
-
- Statement regarding thermal cycling of the targets receiving >1 KW power.
- Updates on Flux Monitor (Mikhail)
- Updates on Active Collimator (Richard)
- Any other business
Minutes
Present: