Difference between revisions of "May 26th, 2020"

From kl project
Jump to navigation Jump to search
Line 4: Line 4:
 
* Supplemental materials:
 
* Supplemental materials:
  
** Final version of KLF_Analysis_ Report (hyperon case) [].
+
- Final version of KLF_Analysis_ Report (hyperon case) [].
  
** Final version of New_Equipment [].
+
-- Final version of New_Equipment [].
  
 
** Final version of the Raster document [].
 
** Final version of the Raster document [].

Revision as of 10:03, 14 May 2020

Attended: Igor.


  • Supplemental materials:

- Final version of KLF_Analysis_ Report (hyperon case) [].

-- Final version of New_Equipment [].

    • Final version of the Raster document [].
    • Final version of the KFM [].
    • Final version of the KPT [].
    • Final version of the CPS [].
    • Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline [].
    • Cover_Letter draft [].
    • KLF_Analysis_ Report (meson case) is coming


  • The next meeting is scheduled for June 9th, 7AM [1]