Difference between revisions of "May 26th, 2020"
Jump to navigation
Jump to search
Line 6: | Line 6: | ||
- Final version of KLF_Analysis_ Report (hyperon case) []. | - Final version of KLF_Analysis_ Report (hyperon case) []. | ||
− | + | - Final version of New_Equipment []. | |
− | + | - Final version of the Raster document []. | |
− | + | - Final version of the KFM []. | |
− | + | - Final version of the KPT []. | |
− | + | - Final version of the CPS []. | |
− | + | - Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline []. | |
− | + | - Cover_Letter draft []. | |
− | + | - KLF_Analysis_ Report (meson case) is coming | |
* The next meeting is scheduled for June 9th, 7AM [https://wiki.jlab.org/klproject/index.php/June_9th,_2020] | * The next meeting is scheduled for June 9th, 7AM [https://wiki.jlab.org/klproject/index.php/June_9th,_2020] |
Revision as of 09:04, 14 May 2020
Attended: Igor.
- Supplemental materials:
- Final version of KLF_Analysis_ Report (hyperon case) [].
- Final version of New_Equipment [].
- Final version of the Raster document [].
- Final version of the KFM [].
- Final version of the KPT [].
- Final version of the CPS [].
- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline [].
- Cover_Letter draft [].
- KLF_Analysis_ Report (meson case) is coming
- The next meeting is scheduled for June 9th, 7AM [1]