Difference between revisions of "May 26th, 2020"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
* Supplemental materials: | * Supplemental materials: | ||
− | - Final version of KLF_Analysis_ Report (hyperon case) []. | + | - Final version of KLF_Analysis_ Report (hyperon case) [https://wiki.jlab.org/klproject/index.php/File:KLF_Analysis_Report_(4).pdf]. Tex version is available at overleaf [https://www.overleaf.com/project/5e81c348f54cef0001a996f2]. |
- Final version of New_Equipment []. | - Final version of New_Equipment []. |
Revision as of 09:07, 14 May 2020
Attended: Igor.
- Supplemental materials:
- Final version of KLF_Analysis_ Report (hyperon case) [1]. Tex version is available at overleaf [2].
- Final version of New_Equipment [].
- Final version of the Raster document [].
- Final version of the KFM [].
- Final version of the KPT [].
- Final version of the CPS [].
- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline [].
- Cover_Letter draft [].
- KLF_Analysis_ Report (meson case) is coming
- The next meeting is scheduled for June 9th, 7AM [3]