− | - Final version of KLF_Analysis_ Report (hyperon case) [https://wiki.jlab.org/klproject/ | + | - Final version of KLF_Analysis_ Report (hyperon case) [https://wiki.jlab.org/klproject/images/0/08/KLF_Analysis_Report_%284%29.pdf]. Tex version is available at overleaf [https://www.overleaf.com/project/5e81c348f54cef0001a996f2]. |
- Final version of New_Equipment []. | - Final version of New_Equipment []. |
Revision as of 09:09, 14 May 2020
Attended: Igor.
- Supplemental materials:
- Final version of KLF_Analysis_ Report (hyperon case) [1]. Tex version is available at overleaf [2].
- Final version of New_Equipment [].
- Final version of the Raster document [].
- Final version of the KFM [].
- Final version of the KPT [].
- Final version of the CPS [].
- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline [].
- Cover_Letter draft [].
- KLF_Analysis_ Report (meson case) is coming
- The next meeting is scheduled for June 9th, 7AM [3]