Difference between revisions of "May 26th, 2020"

From kl project
Jump to navigation Jump to search
Line 4: Line 4:
 
* Supplemental materials:
 
* Supplemental materials:
  
- Final version of KLF_Analysis_ Report (hyperon case) [https://wiki.jlab.org/klproject/index.php/File:KLF_Analysis_Report_(4).pdf]. Tex version is available at overleaf [https://www.overleaf.com/project/5e81c348f54cef0001a996f2].  
+
- Final version of KLF_Analysis_ Report (hyperon case) [https://wiki.jlab.org/klproject/images/0/08/KLF_Analysis_Report_%284%29.pdf]. Tex version is available at overleaf [https://www.overleaf.com/project/5e81c348f54cef0001a996f2].  
  
 
- Final version of New_Equipment [].
 
- Final version of New_Equipment [].

Revision as of 09:09, 14 May 2020

Attended: Igor.


  • Supplemental materials:

- Final version of KLF_Analysis_ Report (hyperon case) [1]. Tex version is available at overleaf [2].

- Final version of New_Equipment [].

- Final version of the Raster document [].

- Final version of the KFM [].

- Final version of the KPT [].

- Final version of the CPS [].

- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline [].

- Cover_Letter draft [].

- KLF_Analysis_ Report (meson case) is coming


  • The next meeting is scheduled for June 9th, 7AM [3]