Line 8: Line 8:
 
- Final version of New_Equipment [https://wiki.jlab.org/klproject/images/0/0c/NewEquipment48.pdf].
 
- Final version of New_Equipment [https://wiki.jlab.org/klproject/images/0/0c/NewEquipment48.pdf].
  
- Final version of the Raster document [].
+
- Final version of the Raster document [https://wiki.jlab.org/klproject/images/8/8e/2020-05-07-KLF-Final-Focus.pdf].
  
 
- Final version of the KFM [].
 
- Final version of the KFM [].

Revision as of 09:14, 14 May 2020

Attended: Igor.


  • Supplemental materials:

- Final version of KLF_Analysis_ Report (hyperon case) [1]. Tex version is available at overleaf [2].

- Final version of New_Equipment [3].

- Final version of the Raster document [4].

- Final version of the KFM [].

- Final version of the KPT [].

- Final version of the CPS [].

- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline [].

- Cover_Letter draft [].

- KLF_Analysis_ Report (meson case) is coming


  • The next meeting is scheduled for June 9th, 7AM [5]