Difference between revisions of "May 26th, 2020"
Jump to navigation
Jump to search
Line 8: | Line 8: | ||
- Final version of New_Equipment [https://wiki.jlab.org/klproject/images/0/0c/NewEquipment48.pdf]. | - Final version of New_Equipment [https://wiki.jlab.org/klproject/images/0/0c/NewEquipment48.pdf]. | ||
− | - Final version of the Raster document []. | + | - Final version of the Raster document [https://wiki.jlab.org/klproject/images/8/8e/2020-05-07-KLF-Final-Focus.pdf]. |
- Final version of the KFM []. | - Final version of the KFM []. |
Revision as of 09:14, 14 May 2020
Attended: Igor.
- Supplemental materials:
- Final version of KLF_Analysis_ Report (hyperon case) [1]. Tex version is available at overleaf [2].
- Final version of New_Equipment [3].
- Final version of the Raster document [4].
- Final version of the KFM [].
- Final version of the KPT [].
- Final version of the CPS [].
- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline [].
- Cover_Letter draft [].
- KLF_Analysis_ Report (meson case) is coming
- The next meeting is scheduled for June 9th, 7AM [5]