Difference between revisions of "April 25th, 2022"
Jump to navigation
Jump to search
(Created page with "<b>Attended</b>: and ''Igor''. *") |
|||
Line 2: | Line 2: | ||
− | * | + | * On April 8th, we had a ''Hovanes''' CPS meeting for a development of the engineering design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_April_8,_2022]. It has ''Vitaly's'' slides and was a long discussion with ''Pavel'' and radiation situation in the Tiger Hall. ''Pavel'' promised to do some estiamtions. |
+ | |||
+ | * On April 8th, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/March_03,_2022_KLONG_Phase_II_Design_Meeting] |
Revision as of 09:16, 8 April 2022
Attended: and Igor.
- On April 8th, we had a Hovanes' CPS meeting for a development of the engineering design of the Tiger hall with CPS [1]. It has Vitaly's slides and was a long discussion with Pavel and radiation situation in the Tiger Hall. Pavel promised to do some estiamtions.
- On April 8th, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [2]