Difference between revisions of "November 15th, 2022"
Jump to navigation
Jump to search
Line 17: | Line 17: | ||
* On October 31st, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_October_31,_2022]. | * On October 31st, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_October_31,_2022]. | ||
− | :: ''Pavel'' | + | :: Magnet (''Pavel'') |
:: Updates on conceptual design (''Vitaly'') | :: Updates on conceptual design (''Vitaly'') | ||
− | :: ''Tim'' | + | :: Temperature calculations (''Tim'') |
* Thursday, November 10th, we had the 6th KLF Collaboration meeting. The agenda is at [https://wiki.jlab.org/klproject/index.php/November,_10th_2022]. | * Thursday, November 10th, we had the 6th KLF Collaboration meeting. The agenda is at [https://wiki.jlab.org/klproject/index.php/November,_10th_2022]. |
Revision as of 20:58, 30 October 2022
Attended: ..., and Igor.
- On October 3rd, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [1]. Temperature map calculations (Tim). Updates on the conceptual design (Vitaly).
- On October 17th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [2].
- Temperature map calculations (Tim).
- Updates on the conceptual design (Vitaly) [3].
- Adding raster to FLUKA simulations (Hovanes):
- -Convolution of two distributions: Gaussian ⨁ Rastering;
- -Gaussian with 2.5 mm in FWHM (which is the same as 1.1 mm in RMS);
- -Uniform rastering of the center of the Gaussian within D = 2 mm;
- -Raster only the beam position but not the angle (parallel shift);
- -Wider channel may be needed;
- -Evaluate the impact of FWHM dropping to 1mm instead of 2.5 mm but keeping the raster on.
- On October 21st, Tanja Horn had a CPS meeting (main focus is CPS for Hall C)[4].
- On October 31st, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [5].
- Magnet (Pavel)
- Updates on conceptual design (Vitaly)
- Temperature calculations (Tim)
- Thursday, November 10th, we had the 6th KLF Collaboration meeting. The agenda is at [6].