Difference between revisions of "November 15th, 2022"

From kl project
Jump to navigation Jump to search
Line 7: Line 7:
 
:* Updates on the conceptual design (''Vitaly'') [https://wiki.jlab.org/klproject/images/4/46/CPS-CONC-101822.pdf].  
 
:* Updates on the conceptual design (''Vitaly'') [https://wiki.jlab.org/klproject/images/4/46/CPS-CONC-101822.pdf].  
 
:* Adding raster to FLUKA simulations (''Hovanes''):  
 
:* Adding raster to FLUKA simulations (''Hovanes''):  
::-Convolution of two distributions: Gaussian ⨁ Rastering;  
+
:: Convolution of two distributions: Gaussian ⨁ Rastering;  
::-Gaussian with 2.5 mm in FWHM (which is the same as 1.1 mm in RMS);  
+
:: Gaussian with 2.5 mm in FWHM (which is the same as 1.1 mm in RMS);  
::-Uniform rastering of the center of the Gaussian within D = 2 mm;  
+
:: Uniform rastering of the center of the Gaussian within D = 2 mm;  
::-Raster only the beam position but not the angle (parallel shift);  
+
:: Raster only the beam position but not the angle (parallel shift);  
::-Wider channel may be needed;  
+
:: Wider channel may be needed;  
::-Evaluate the impact of FWHM dropping to 1mm instead of 2.5 mm but keeping the raster on.
+
:: Evaluate the impact of FWHM dropping to 1 mm instead of 2.5 mm but keeping the raster on.
  
* On October 21st, ''Tanja Horn'' had a ''CPS'' meeting (main focus is CPS for Hall C)[https://wiki.jlab.org/cuawiki/index.php/Meeting_21_October_2022].
+
* On October 21st, ''Tanja Horn'' had a ''CPS'' meeting (main focus is CPS for Hall C) [https://wiki.jlab.org/cuawiki/index.php/Meeting_21_October_2022].
  
 
* On October 31st, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_October_31,_2022].  
 
* On October 31st, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_October_31,_2022].  

Revision as of 21:01, 30 October 2022

Attended: ..., and Igor.

  • On October 3rd, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [1]. Temperature map calculations (Tim). Updates on the conceptual design (Vitaly).
  • On October 17th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [2].
  • Temperature map calculations (Tim).
  • Updates on the conceptual design (Vitaly) [3].
  • Adding raster to FLUKA simulations (Hovanes):
Convolution of two distributions: Gaussian ⨁ Rastering;
Gaussian with 2.5 mm in FWHM (which is the same as 1.1 mm in RMS);
Uniform rastering of the center of the Gaussian within D = 2 mm;
Raster only the beam position but not the angle (parallel shift);
Wider channel may be needed;
Evaluate the impact of FWHM dropping to 1 mm instead of 2.5 mm but keeping the raster on.
  • On October 21st, Tanja Horn had a CPS meeting (main focus is CPS for Hall C) [4].
  • On October 31st, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [5].
Magnet (Pavel)
Updates on conceptual design (Vitaly)
Temperature calculations (Tim)


  • Thursday, November 10th, we had the 6th KLF Collaboration meeting. The agenda is at [6].