Difference between revisions of "December 6th, 2022"
Jump to navigation
Jump to search
Line 14: | Line 14: | ||
:: Temperature calculations (''Tim''). | :: Temperature calculations (''Tim''). | ||
:: Updates on conceptual design (''Vitaly''). | :: Updates on conceptual design (''Vitaly''). | ||
− | :: | + | :: [[media:pavels_model_12_05_2022.pptx | Updates to Pavel's model]] (''Pavel'') |
:: [[media:magnet_study_opera_12_05_2022.pdf | Magnet studies with OPERA]] (''Hovanes''). | :: [[media:magnet_study_opera_12_05_2022.pdf | Magnet studies with OPERA]] (''Hovanes''). | ||
Revision as of 15:58, 5 December 2022
Attended: ... and Igor.
- On November 28th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tagger vault with CPS [1].
- Updates on conceptual design (Vitaly)
- Temperature calculations (Tim)
- Alternative model (Pavel)
- Extra material to browse (Pavel)
- Magnet studies with OPERA (Hovanes)
- On December 2nd, Tanja Horn had a CPS meeting (main focus is CPS for Hall C, incuding stress/thermal calculations) [2].
- On December 5th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tagger vault with CPS [3].
- Temperature calculations (Tim).
- Updates on conceptual design (Vitaly).
- Updates to Pavel's model (Pavel)
- Magnet studies with OPERA (Hovanes).
- On December 5th, Patrizia sent us a Charge for ERR Charge for ERR-I.
- On December 8th, we had a Hovanes KPT meeting for ERR [4].