Difference between revisions of "December 6th, 2022"
Jump to navigation
Jump to search
Line 19: | Line 19: | ||
* On December 5th, Patrizia sent us a Charge for ERR [https://wiki.jlab.org/klproject/images/c/cc/Charge_KLF_ERR_phase_I.pdf Charge for ERR-I]. | * On December 5th, Patrizia sent us a Charge for ERR [https://wiki.jlab.org/klproject/images/c/cc/Charge_KLF_ERR_phase_I.pdf Charge for ERR-I]. | ||
− | * On December 8th, we had a ''Hovanes'' KPT meeting for ERR [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_December_8,_2022]. | + | * On December 8th, we had a ''Hovanes'' KPT meeting for to prepare for ERR [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_December_8,_2022]. |
Revision as of 14:59, 8 December 2022
Attended: Moskov, Sean, Mikhail, Justin, Eugene, Hovanes, and Igor.
- On November 28th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tagger vault with CPS [1].
- Updates on conceptual design (Vitaly)
- Temperature calculations (Tim)
- Alternative model (Pavel)
- Extra material to browse (Pavel)
- Magnet studies with OPERA (Hovanes)
- On December 2nd, Tanja Horn had a CPS meeting (main focus is CPS for Hall C, incuding stress/thermal calculations) [2].
- On December 5th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tagger vault with CPS [3].
- Temperature calculations (Tim)
- Updates on conceptual design (Vitaly).
- Updates to Pavel's model (Pavel)
- Magnet studies with OPERA (Hovanes).
- On December 5th, Patrizia sent us a Charge for ERR Charge for ERR-I.
- On December 8th, we had a Hovanes KPT meeting for to prepare for ERR [4].