Difference between revisions of "February 28th, 2023"

From kl project
Jump to navigation Jump to search
Line 7: Line 7:
  
 
* On February 27th, we had a meeting with FNAL folks to discuss a possibility to use FNAL EPB dipole for the CPS.
 
* On February 27th, we had a meeting with FNAL folks to discuss a possibility to use FNAL EPB dipole for the CPS.
:* Questions from Dave  
+
:* Questions from Dave Harding:
 +
:* What is your schedule?  When would you need the magnet?
 +
:* Should we assume that this is a permanent installation rather than a loan?
 +
:* Would the magnet go straight to JLab?  The issue here is making sure that whatever organization receives the magnet has the appropriate licenses to handle the (very slightly) radioactive material.
 +
:* Given the current condition of the magnets that we do not consider ready spares, would you want us to refurbish the selected magnet to our current standards?
 +
:* Do you have any special requirements on the power and water connections?  I’m attaching a photo of one such magnet that we refurbished last year so you can get a feeling for our standard configuration.
 +
:* Would you want our beam tube left in place?
 +
:* Would you need a spare magnet?
 
:* [https://wiki.jlab.org/klproject/images/a/a7/20220302_121838.jpg View of EPD dipole]
 
:* [https://wiki.jlab.org/klproject/images/a/a7/20220302_121838.jpg View of EPD dipole]
  

Revision as of 21:36, 22 February 2023

Attended: ... and Igor.

  • Moskov proposed to think about ERR-I in March/April [1].
  • Moskov proposed to think about a 7th KLF Collaboration Meeting in May/June after ERR-!.


  • On February 27th, we had a meeting with FNAL folks to discuss a possibility to use FNAL EPB dipole for the CPS.
  • Questions from Dave Harding:
  • What is your schedule? When would you need the magnet?
  • Should we assume that this is a permanent installation rather than a loan?
  • Would the magnet go straight to JLab? The issue here is making sure that whatever organization receives the magnet has the appropriate licenses to handle the (very slightly) radioactive material.
  • Given the current condition of the magnets that we do not consider ready spares, would you want us to refurbish the selected magnet to our current standards?
  • Do you have any special requirements on the power and water connections? I’m attaching a photo of one such magnet that we refurbished last year so you can get a feeling for our standard configuration.
  • Would you want our beam tube left in place?
  • Would you need a spare magnet?
  • View of EPD dipole
  • On February 20th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].
  • Temperature calculations (Tim).
  • Review of Vitaly's model.
  • On February 6th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [3].
  • On February 9th, we had a Hovanes KPT meeting for to prepare for ERR-I [4].