:* Would the magnet go straight to JLab? The issue here is making sure that whatever organization receives the magnet has the appropriate licenses to handle the (very slightly) radioactive material. | :* Would the magnet go straight to JLab? The issue here is making sure that whatever organization receives the magnet has the appropriate licenses to handle the (very slightly) radioactive material. | ||
:* Given the current condition of the magnets that we do not consider ready spares, would you want us to refurbish the selected magnet to our current standards? | :* Given the current condition of the magnets that we do not consider ready spares, would you want us to refurbish the selected magnet to our current standards? | ||
− | :* Do you have any special requirements on the power and water connections? I’m attaching a photo of one such magnet that we refurbished last year so you can get a feeling for our standard configuration. | + | :* Do you have any special requirements on the power and water connections? [https://wiki.jlab.org/klproject/images/a/a7/20220302_121838.jpg I’m attaching a photo of one such magnet that we refurbished last year so you can get a feeling for our standard configuration]. |
:* Would you want our beam tube left in place? | :* Would you want our beam tube left in place? | ||
:* Would you need a spare magnet? | :* Would you need a spare magnet? |
Revision as of 20:38, 22 February 2023
Attended: ... and Igor.
- Moskov proposed to think about ERR-I in March/April [1].
- Moskov proposed to think about a 7th KLF Collaboration Meeting in May/June after ERR-!.
- On February 27th, we had a meeting with FNAL folks to discuss a possibility to use FNAL EPB dipole for the CPS.
- Questions from Dave Harding:
- What is your schedule? When would you need the magnet?
- Should we assume that this is a permanent installation rather than a loan?
- Would the magnet go straight to JLab? The issue here is making sure that whatever organization receives the magnet has the appropriate licenses to handle the (very slightly) radioactive material.
- Given the current condition of the magnets that we do not consider ready spares, would you want us to refurbish the selected magnet to our current standards?
- Do you have any special requirements on the power and water connections? I’m attaching a photo of one such magnet that we refurbished last year so you can get a feeling for our standard configuration.
- Would you want our beam tube left in place?
- Would you need a spare magnet?
- View of EPD dipole
- On February 20th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].
- Temperature calculations (Tim).
- Review of Vitaly's model.
- On February 6th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [3].
- Temperature calculations (Tim).
- Review of Vitaly's model.
- On February 9th, we had a Hovanes KPT meeting for to prepare for ERR-I [4].