Difference between revisions of "June 28th, 2023"

From kl project
Jump to navigation Jump to search
Line 13: Line 13:
  
 
* KFM document is in progress.
 
* KFM document is in progress.
 +
 +
* CPS document is coming.
  
  

Revision as of 16:11, 20 June 2023

Attended: Moskov, ..., and Igor.

  • Agenda:
  • 7th KLF Collab meeting is scheduled for September 19 [1].
  • Our preparation for EER-I scheduled for the first week of August (Eugene).
  • CPS status (Hovanes)
  • KFM status (Mikhail)
  • 128-ns status (Moskov)
  • Engeneering work status (Eugene)


  • KFM document is in progress.
  • CPS document is coming.


  • There are several refs for radiation demage on electronics [2][3][4][5]


  • On June 20th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [6].
  • Thermal analysis and thermal stress analysis in ANSYS (Tim)
  • Summary of thermal analysis of the models (Hovanes)
  • Photon beam and material budget (Pavel)
  • Radiation environment, material budget and photon beam quality (Vitaly)


  • Hovanes informed us that Patrizia is scheduled ERR-I for August 2nd. Committee is coming.