Difference between revisions of "June 28th, 2023"
Jump to navigation
Jump to search
Line 17: | Line 17: | ||
− | * | + | * On June 26th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_June_26,_2023]. |
+ | |||
+ | |||
+ | * ''Hovanes'' informed us that ''Patrizia'' is scheduled ERR-I for August 2nd. Committee is coming. | ||
Line 27: | Line 30: | ||
− | * | + | * There are several refs for radiation demage on electronics [https://aerospace.honeywell.com/content/dam/aerobt/en/documents/learn/products/microelectronics/brochures/RadiationHardenedSOICMOSTechnology-bro.pdf][https://en.wikipedia.org/wiki/KOMDIV-32][https://en.wikipedia.org/wiki/RAD750][https://www.jlab.org/accel/RadCon/opsgraphs/HallD%20Compact%20Photon%20Source.pdf] |
Revision as of 15:19, 20 June 2023
Attended: Moskov, ..., and Igor.
- Agenda:
- 7th KLF Collab meeting is scheduled for September 19 [1].
- Our preparation for EER-I scheduled for the first week of August (Eugene).
- CPS status (Hovanes)
- KFM status (Mikhail)
- 128-ns status (Moskov)
- Engeneering work status (Eugene)
- KPT document is ready for ERR-I Conceptual design of KPT.
- KFM document is in progress.
- CPS document is coming.
- On June 26th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].
- Hovanes informed us that Patrizia is scheduled ERR-I for August 2nd. Committee is coming.
- On June 20th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [3].
- Thermal analysis and thermal stress analysis in ANSYS (Tim)
- Summary of thermal analysis of the models (Hovanes)
- Photon beam and material budget (Pavel)
- Radiation environment, material budget and photon beam quality (Vitaly)