Difference between revisions of "KLF Phase I ERR"
Jump to navigation
Jump to search
Line 27: | Line 27: | ||
== Tentative Agenda == | == Tentative Agenda == | ||
:* <font color=blue>''Patrizia Rossi''</font> [Welcome and Introduction], <font color=magenta>10+5'</font>. | :* <font color=blue>''Patrizia Rossi''</font> [Welcome and Introduction], <font color=magenta>10+5'</font>. | ||
− | :* <font color=blue>''Moskov Amaryan''</font> [ | + | :* <font color=blue>''Moskov Amaryan''</font> [https://wiki.jlab.org/klproject/images/5/52/Amaryan_KLF_ERR.pdf K-long Facility in Hall D], and #9, <font color=magenta>20+15'</font>. |
:* <font color=blue>''Eugene Chudakov''</font> [Hall D Status and the Scope of Work]: #1,12,13, <font color=magenta>xx+yy'</font>. | :* <font color=blue>''Eugene Chudakov''</font> [Hall D Status and the Scope of Work]: #1,12,13, <font color=magenta>xx+yy'</font>. | ||
:* <font color=blue>''Hovanes Egiyan''</font> [CPS: Conceptual design]: #2,3,4,10, <font color=magenta>30+10'</font>. | :* <font color=blue>''Hovanes Egiyan''</font> [CPS: Conceptual design]: #2,3,4,10, <font color=magenta>30+10'</font>. |
Revision as of 10:38, 30 June 2023
KLF Phase I ERR (August 2nd, 2023)
KLF Proposal
- KLF Proposal C12-19-001 e-Print: 2008.08215 [nucl-ex]
Charge
Committee
- Chad Bailey (Environment, Safety, & Health)
- Dan Carman (Kaon Flux Detector)
- Silviu Covrig Dusa (Be-Target)
- Jim Fast (Engineering + Costing) - Chair
- Joe Grames (Accelerator/KLF beam)
- Todd Satogata (Accelerator/KLF beam)
- Jim Shanks (CPS)
- Lorenzo Zana (CPS)
- Ed Folts (Division Safety Officer – Observer)
- Doug Higinbotham (Observer)
Tentative Agenda
- Patrizia Rossi [Welcome and Introduction], 10+5'.
- Moskov Amaryan K-long Facility in Hall D, and #9, 20+15'.
- Eugene Chudakov [Hall D Status and the Scope of Work]: #1,12,13, xx+yy'.
- Hovanes Egiyan [CPS: Conceptual design]: #2,3,4,10, 30+10'.
- Igor Strakovsky and Vitaly Baturin KPT: Conceptual design and Radiation factors: #5,6,7,12, 20+15'.
- Mikhail Bashkanov KL Flux Monitor: #8,12, 20+15'.
- Tim Whitlatch [CPS and KPT: Engineering design, Cooling, and Cost estimation]: #2,3,5,6,12,13, xx+yy'.
- Geoff Krafft [Low repetition rate running and Laser status]: #9,10,11, 20+15'.
- Riad Suleiman [Beam diagnostics, locks, and considerations for simultaneous parity quality beam]: #9,10,11, 20+15'.
- Edith Nissen [Electron beam characteristics]: #10, xx+yy'.
Documents
- [Compact Photon Source for Hall D at Jefferson Laboratory (Technical Note) ]
- Kaon Production Target for Hall D at Jefferson Laboratory (Technical Note)
- [Kaon Flux Monitor for Hall D at Jefferson Laboratory (Technical Note)]