Difference between revisions of "KLF Phase I ERR"
Jump to navigation
Jump to search
Line 34: | Line 34: | ||
:* <font color=blue>''Igor Strakovsky'' and ''Vitaly Baturin'', </font> [https://wiki.jlab.org/klproject/images/9/92/KLF2023b_Igor.pdf KPT: Conceptual design and Radiation factors]: #5,6,7,12, <font color=magenta>20+15'</font>. | :* <font color=blue>''Igor Strakovsky'' and ''Vitaly Baturin'', </font> [https://wiki.jlab.org/klproject/images/9/92/KLF2023b_Igor.pdf KPT: Conceptual design and Radiation factors]: #5,6,7,12, <font color=magenta>20+15'</font>. | ||
:* <font color=blue>''Mikhail Bashkanov'', </font> [https://wiki.jlab.org/klproject/images/2/2e/KLF_2023_Aug_v1.pdf KL Flux Monitor]: #8,12, <font color=magenta>20+15'</font>. | :* <font color=blue>''Mikhail Bashkanov'', </font> [https://wiki.jlab.org/klproject/images/2/2e/KLF_2023_Aug_v1.pdf KL Flux Monitor]: #8,12, <font color=magenta>20+15'</font>. | ||
− | :* <font color=blue>''Tim Whitlatch''</font>, [CPS and KPT: Engineering design, Cooling, and Cost estimation]: #2,3,5,6,12,13, <font color=magenta> | + | :* <font color=blue>''Tim Whitlatch''</font>, [CPS and KPT: Engineering design, Cooling, and Cost estimation]: #2,3,5,6,12,13, <font color=magenta>20+15'</font>. |
:* <font color=blue>''Geoff Krafft''</font>, [Low repetition rate running and Laser status]: #9,10,11, <font color=magenta>20+15'</font>. | :* <font color=blue>''Geoff Krafft''</font>, [Low repetition rate running and Laser status]: #9,10,11, <font color=magenta>20+15'</font>. | ||
:* <font color=blue>''Riad Suleiman''</font>, [Beam diagnostics, locks, and considerations for simultaneous parity quality beam]: #9,10,11, <font color=magenta>20+15'</font>. | :* <font color=blue>''Riad Suleiman''</font>, [Beam diagnostics, locks, and considerations for simultaneous parity quality beam]: #9,10,11, <font color=magenta>20+15'</font>. |
Revision as of 18:02, 30 June 2023
KLF Phase I ERR (August 2nd, 2023)
KLF Proposal
- KLF Proposal C12-19-001 e-Print: 2008.08215 [nucl-ex]
Charge
Committee
- Chad Bailey (Environment, Safety, & Health)
- Dan Carman (Kaon Flux Detector)
- Silviu Covrig Dusa (Be-Target)
- Jim Fast (Engineering + Costing) - Chair
- Joe Grames (Accelerator/KLF beam)
- Todd Satogata (Accelerator/KLF beam)
- Jim Shanks (CPS)
- Lorenzo Zana (CPS)
- Ed Folts (Division Safety Officer – Observer)
- Doug Higinbotham (Observer)
Tentative Agenda
- Patrizia Rossi, [Welcome and Introduction], 10+5'.
- Moskov Amaryan, K-long Facility in Hall D, and #9, 20+15'.
- Eugene Chudakov, [Hall D Status]: #12,13, 15+5'.
- Hovanes Egiyan, [Status of the project]: #1,13, 15+5'.
- Hovanes Egiyan, [CPS: Conceptual design]: #2,3,4,10, 30+15'.
- Igor Strakovsky and Vitaly Baturin, KPT: Conceptual design and Radiation factors: #5,6,7,12, 20+15'.
- Mikhail Bashkanov, KL Flux Monitor: #8,12, 20+15'.
- Tim Whitlatch, [CPS and KPT: Engineering design, Cooling, and Cost estimation]: #2,3,5,6,12,13, 20+15'.
- Geoff Krafft, [Low repetition rate running and Laser status]: #9,10,11, 20+15'.
- Riad Suleiman, [Beam diagnostics, locks, and considerations for simultaneous parity quality beam]: #9,10,11, 20+15'.
- Edith Nissen, [Electron beam characteristics]: #10, 20+15'.
Documents
- [Compact Photon Source for Hall D at Jefferson Laboratory (Technical Note) ]
- Kaon Production Target for Hall D at Jefferson Laboratory (Technical Note)
- [Kaon Flux Monitor for Hall D at Jefferson Laboratory (Technical Note)]