Difference between revisions of "KLF Phase I ERR"

From kl project
Jump to navigation Jump to search
Line 26: Line 26:
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==
:* (10+5) <font color=blue>''Patrizia Rossi''</font>, [Welcome and Introduction], <font color=magenta>10+5'</font>.
+
:* (10+5') <font color=blue>''Patrizia Rossi''</font>, [Welcome and Introduction].
:* () <font color=blue>''Moskov Amaryan''</font>, [https://wiki.jlab.org/klproject/images/5/52/Amaryan_KLF_ERR.pdf K-long Facility in Hall D], and #9, <font color=magenta>20+15'</font>.
+
:* (20+15') <font color=blue>''Moskov Amaryan''</font>, [https://wiki.jlab.org/klproject/images/5/52/Amaryan_KLF_ERR.pdf K-long Facility in Hall D], and #9.
:* () <font color=blue>''Eugene Chudakov''</font>, [Hall D Status]: #12,13, <font color=magenta>15+5'</font>.
+
:* (15+5') <font color=blue>''Eugene Chudakov''</font>, [Hall D Status]: #12,13.
 
:* () <font color=blue>''Hovanes Egiyan''</font>, [Status of the project]: #1,13, <font color=magenta>15+5'</font>.
 
:* () <font color=blue>''Hovanes Egiyan''</font>, [Status of the project]: #1,13, <font color=magenta>15+5'</font>.
 
:* () <font color=blue>''Hovanes Egiyan''</font>, [CPS: Conceptual design]: #2,3,4,10, <font color=magenta>30+15'</font>.
 
:* () <font color=blue>''Hovanes Egiyan''</font>, [CPS: Conceptual design]: #2,3,4,10, <font color=magenta>30+15'</font>.

Revision as of 19:40, 30 June 2023

KLF Phase I ERR (August 2nd, 2023)

KLF Proposal

Charge

Committee

  • Chad Bailey (Environment, Safety, & Health)
  • Dan Carman (Kaon Flux Detector)
  • Silviu Covrig Dusa (Be-Target)
  • Jim Fast (Engineering + Costing) - Chair
  • Joe Grames (Accelerator/KLF beam)
  • Todd Satogata (Accelerator/KLF beam)
  • Jim Shanks (CPS)
  • Lorenzo Zana (CPS)
  • Ed Folts (Division Safety Officer – Observer)
  • Doug Higinbotham (Observer)

Tentative Agenda

  • (10+5') Patrizia Rossi, [Welcome and Introduction].
  • (20+15') Moskov Amaryan, K-long Facility in Hall D, and #9.
  • (15+5') Eugene Chudakov, [Hall D Status]: #12,13.
  • () Hovanes Egiyan, [Status of the project]: #1,13, 15+5'.
  • () Hovanes Egiyan, [CPS: Conceptual design]: #2,3,4,10, 30+15'.
  • () Igor Strakovsky and Vitaly Baturin, KPT: Conceptual design and Radiation factors: #5,6,7,12, 20+15'.
  • () Mikhail Bashkanov, KL Flux Monitor: #8,12, 20+15'.
  • () Tim Whitlatch, [CPS and KPT: Engineering design, Cooling, and Cost estimation]: #2,3,5,6,12,13, 20+15'.
  • () Geoff Krafft, [Low repetition rate running and Laser status]: #9,10,11, 20+15'.
  • () Riad Suleiman, [Beam diagnostics, locks, and considerations for simultaneous parity quality beam]: #9,10,11, 20+15'.
  • (20+15) Edith Nissen, [Electron beam characteristics]: #10, 20+15'.

Documents