Difference between revisions of "KLF Phase I ERR"
Jump to navigation
Jump to search
Line 26: | Line 26: | ||
== Tentative Agenda == | == Tentative Agenda == | ||
− | :* (10+5) <font color=blue>''Patrizia Rossi''</font>, [Welcome and Introduction] | + | :* (10+5') <font color=blue>''Patrizia Rossi''</font>, [Welcome and Introduction]. |
− | :* () <font color=blue>''Moskov Amaryan''</font>, [https://wiki.jlab.org/klproject/images/5/52/Amaryan_KLF_ERR.pdf K-long Facility in Hall D], and #9 | + | :* (20+15') <font color=blue>''Moskov Amaryan''</font>, [https://wiki.jlab.org/klproject/images/5/52/Amaryan_KLF_ERR.pdf K-long Facility in Hall D], and #9. |
− | :* () <font color=blue>''Eugene Chudakov''</font>, [Hall D Status]: #12,13 | + | :* (15+5') <font color=blue>''Eugene Chudakov''</font>, [Hall D Status]: #12,13. |
:* () <font color=blue>''Hovanes Egiyan''</font>, [Status of the project]: #1,13, <font color=magenta>15+5'</font>. | :* () <font color=blue>''Hovanes Egiyan''</font>, [Status of the project]: #1,13, <font color=magenta>15+5'</font>. | ||
:* () <font color=blue>''Hovanes Egiyan''</font>, [CPS: Conceptual design]: #2,3,4,10, <font color=magenta>30+15'</font>. | :* () <font color=blue>''Hovanes Egiyan''</font>, [CPS: Conceptual design]: #2,3,4,10, <font color=magenta>30+15'</font>. |
Revision as of 19:40, 30 June 2023
KLF Phase I ERR (August 2nd, 2023)
KLF Proposal
- KLF Proposal C12-19-001 e-Print: 2008.08215 [nucl-ex]
Charge
Committee
- Chad Bailey (Environment, Safety, & Health)
- Dan Carman (Kaon Flux Detector)
- Silviu Covrig Dusa (Be-Target)
- Jim Fast (Engineering + Costing) - Chair
- Joe Grames (Accelerator/KLF beam)
- Todd Satogata (Accelerator/KLF beam)
- Jim Shanks (CPS)
- Lorenzo Zana (CPS)
- Ed Folts (Division Safety Officer – Observer)
- Doug Higinbotham (Observer)
Tentative Agenda
- (10+5') Patrizia Rossi, [Welcome and Introduction].
- (20+15') Moskov Amaryan, K-long Facility in Hall D, and #9.
- (15+5') Eugene Chudakov, [Hall D Status]: #12,13.
- () Hovanes Egiyan, [Status of the project]: #1,13, 15+5'.
- () Hovanes Egiyan, [CPS: Conceptual design]: #2,3,4,10, 30+15'.
- () Igor Strakovsky and Vitaly Baturin, KPT: Conceptual design and Radiation factors: #5,6,7,12, 20+15'.
- () Mikhail Bashkanov, KL Flux Monitor: #8,12, 20+15'.
- () Tim Whitlatch, [CPS and KPT: Engineering design, Cooling, and Cost estimation]: #2,3,5,6,12,13, 20+15'.
- () Geoff Krafft, [Low repetition rate running and Laser status]: #9,10,11, 20+15'.
- () Riad Suleiman, [Beam diagnostics, locks, and considerations for simultaneous parity quality beam]: #9,10,11, 20+15'.
- (20+15) Edith Nissen, [Electron beam characteristics]: #10, 20+15'.
Documents
- [Compact Photon Source for Hall D at Jefferson Laboratory (Technical Note) ]
- Kaon Production Target for Hall D at Jefferson Laboratory (Technical Note)
- [Kaon Flux Monitor for Hall D at Jefferson Laboratory (Technical Note)]